Why Is Some Rock Mined but Never Sent to the Mill?


Two haul trucks leave the same open pit carrying freshly blasted rock. One heads toward the processing plant. The other climbs a haul road to a waste rock dump. Both loads had to be excavated, but their destinations were determined by two different questions. What rock must be removed to reach the deposit? And which material is worth processing?
Reaching the Ore Means Moving Other Rock
A mineral deposit can lie beneath or alongside rock that contains little of the target metal. As an open pit deepens and expands, crews remove some of that surrounding material to expose the ore and make room for mining. At Namibia’s Otjikoto Gold Mine, for example, excavators and haul trucks move both ore and waste rock. The operation sends medium- and high-grade ore to the plant and places waste rock in a designated dump.
How Mines Decide What Goes to the Mill
Grade measures how much of the target metal a given quantity of rock contains. A gold grade of one gram per tonne means a tonne of rock contains about one gram of gold before processing. The amount the plant can recover is a separate figure, and processing that tonne requires equipment, energy, and time.

A cut-off grade helps translate those economics into a routing decision. Rock can contain measurable gold and still fall below the threshold for processing under a mine’s operating plan. Otjikoto’s environmental management plan, for instance, identifies mineralized material below 0.25 grams of gold per tonne as waste rock. That figure applies to the operation described in the plan.
Why Some Ore Waits in a Stockpile
A stockpile lets a mine separate the timing of excavation from the timing of processing. Otjikoto sets aside low-grade material for later processing. At Mount Milligan in British Columbia, some stockpiled ore with relatively high gold and low copper grades is blended with higher-copper ore so the plant can produce a marketable copper concentrate. In that case, the destination depends partly on how the material performs in a blend.

The three destinations reflect three decisions. The mill receives ore selected for processing. The stockpile holds material for a later processing run or blend. The waste rock dump receives material that the mine plan directs away from processing, including rock removed to reach the ore in the first place.